Difference between revisions of "LinuxTag 2008"

From coreboot
Jump to: navigation, search
(Booth plan)
(What needs to be brought)
Line 9: Line 9:
 
Two possible plans, we don't know yet how much space we get, but 1/2 infopoint is likely.
 
Two possible plans, we don't know yet how much space we get, but 1/2 infopoint is likely.
  
=What needs to be brought=
+
==What needs to be brought==
 +
 
 +
*Flat screen monitor
 +
**(Carl-Daniel is trying to get organizers to lend us one)
 +
 
 +
*Ethernet switch (for the workshop, >20 ports would be preferable)
 +
**(Carl-Daniel is trying to get organizers to lend us one)
 +
 
 +
*Power strip (1 for the booth, 1 big for the workshop)
 +
**Carl-Daniel brings one with 12 sockets on Friday
 +
 
 +
*Artec dongles (for demos and the workshop)
 +
**Carl-Daniel brings one (currently slightly defective) on Friday
 +
 
 +
*ThinCan DBE61 (for demos and the workshop)
 +
**Carl-Daniel brings one on Friday

Revision as of 11:26, 4 May 2008

Who will be there

  • Peter Stuge
  • Paul Menzel
  • Carl-Daniel Hailfinger

Booth plan

Two possible plans, we don't know yet how much space we get, but 1/2 infopoint is likely.

What needs to be brought

  • Flat screen monitor
    • (Carl-Daniel is trying to get organizers to lend us one)
  • Ethernet switch (for the workshop, >20 ports would be preferable)
    • (Carl-Daniel is trying to get organizers to lend us one)
  • Power strip (1 for the booth, 1 big for the workshop)
    • Carl-Daniel brings one with 12 sockets on Friday
  • Artec dongles (for demos and the workshop)
    • Carl-Daniel brings one (currently slightly defective) on Friday
  • ThinCan DBE61 (for demos and the workshop)
    • Carl-Daniel brings one on Friday